Agyekum-Mensah, G, Reid, A and Temitope, T A (2020) Methodological Pluralism: Investigation into Construction Engineering and Management Research Methods. Journal of Construction Engineering and Management, 146(03).

Ayhan, B U and Tokdemir, O B (2020) Accident Analysis for Construction Safety Using Latent Class Clustering and Artificial Neural Networks. Journal of Construction Engineering and Management, 146(03).

Bowen, P and Zhang, R P (2020) Cross-Boundary Contact, Work-Family Conflict, Antecedents, and Consequences: Testing an Integrated Model for Construction Professionals. Journal of Construction Engineering and Management, 146(03).

Chan, A P C, Nwaogu, J M and Naslund, J A (2020) Mental Ill-Health Risk Factors in the Construction Industry: Systematic Review. Journal of Construction Engineering and Management, 146(03).

Collinge, W (2020) Stakeholder Engagement in Construction: Exploring Corporate Social Responsibility, Ethical Behaviors, and Practices. Journal of Construction Engineering and Management, 146(03).

Dutta, A, Breloff, S P, Dai, F, Sinsel, E W, Warren, C M and Wu, J Z (2020) Identifying Potentially Risky Phases Leading to Knee Musculoskeletal Disorders during Shingle Installation Operations. Journal of Construction Engineering and Management, 146(03).

Farahani, A, Wallbaum, H and Dalenbäck, J (2020) Cost-Optimal Maintenance and Renovation Planning in Multifamily Buildings with Annual Budget Constraints. Journal of Construction Engineering and Management, 146(03).

Gao, Y, González, V A and Yiu, T W (2020) Exploring the Relationship between Construction Workers’ Personality Traits and Safety Behavior. Journal of Construction Engineering and Management, 146(03).

Gunduz, M and Elsherbeny, H A (2020) Operational Framework for Managing Construction-Contract Administration Practitioners’ Perspective through Modified Delphi Method. Journal of Construction Engineering and Management, 146(03).

Gurmu, A T and Ongkowijoyo, C S (2020) Predicting Construction Labor Productivity Based on Implementation Levels of Human Resource Management Practices. Journal of Construction Engineering and Management, 146(03).

Haj Seiyed Taghia, S A, Darvishvand, H R and Ebrahimi, M (2020) Economic Analyses for Low-Strength Concrete Wrapped with CFRP to Improve the Mechanical Properties and Seismic Parameters. Journal of Construction Engineering and Management, 146(03).

Ho Song, M and Fischer, M (2020) Empirical Determination of the Smallest Batch Sizes for Daily Planning. Journal of Construction Engineering and Management, 146(03).

Ji, Y and Leite, F (2020) Optimized Planning Approach for Multiple Tower Cranes and Material Supply Points Using Mixed-Integer Programming. Journal of Construction Engineering and Management, 146(03).

  • Type: Journal Article
  • Keywords: Optimization; Mixed-integer programming; Tower crane plan; Branch-and-cut (CBC);
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)CO.1943-7862.0001781
  • Abstract:
    It is common to implement multiple tower cranes on building construction projects. The plan for usage of multiple tower cranes should be optimized for better project performance, such as reduced cost or operation time. Optimization of plans for multiple cranes is complex, especially when considering the supply of transported material (e.g., location, quantity, material type), as well as assigning lift tasks among tower cranes that are in range. This study developed a mathematic formulation that can solve this optimization problem using mixed-integer programming. The formulation introduces several binary variables and restricts the domain of the indices of these variables using an additional set of auxiliary variables. The proposed model contributes to the body of knowledge by showing the feasibility of using mixed-integer-programming techniques to solve the optimization problem of multiple tower cranes and their supply systems. The findings also demonstrate that when a multiple tower crane problem is concerned, optimizing each piece of equipment individually could lead to suboptimal solutions. Specifically, the operation time drops by 6.8% and the operation cost decreases by 3.6% in the two-tower crane case study example. The proposed model can also assist engineers with assessing a large number of alternative plans, which are heavily needed in preconstruction planning, where site layout is preliminary.

Lee, C, Chong, H, Li, Q and Wang, X (2020) Joint Contract–Function Effects on BIM-Enabled EPC Project Performance. Journal of Construction Engineering and Management, 146(03).

Lee, Y Y R, Samad, H and Miang Goh, Y (2020) Perceived Importance of Authentic Learning Factors in Designing Construction Safety Simulation Game-Based Assignment: Random Forest Approach. Journal of Construction Engineering and Management, 146(03).

Lijauco, F, Gajendran, T, Brewer, G and Rasoolimanesh, S M (2020) Impacts of Culture on Innovation Propensity in Small to Medium Enterprises in Construction. Journal of Construction Engineering and Management, 146(03).

Lyu, H, Sun, W, Shen, S and Zhou, A (2020) Risk Assessment Using a New Consulting Process in Fuzzy AHP. Journal of Construction Engineering and Management, 146(03).

Mansouri, S, Castronovo, F and Akhavian, R (2020) Analysis of the Synergistic Effect of Data Analytics and Technology Trends in the AEC/FM Industry. Journal of Construction Engineering and Management, 146(03).

Shiha, A, Dorra, E M and Nassar, K (2020) Neural Networks Model for Prediction of Construction Material Prices in Egypt Using Macroeconomic Indicators. Journal of Construction Engineering and Management, 146(03).

Votto, R, Lee Ho, L and Berssaneti, F (2020) Applying and Assessing Performance of Earned Duration Management Control Charts for EPC Project Duration Monitoring. Journal of Construction Engineering and Management, 146(03).